Sprint board Sprint burndown (hours) Sprint burndown (SPs) ヘルプ

Sprint board help

PBIs & tasks

An Sprint board includes PBIs & tasks. PBIs (or Product Backlog Items) are typically user stories, bugs, technical debts... and they are composed of child tasks. Under Administration » Plugins » Scrum Redmine plugin you can configure which issue trackers are considered PBIs and which are considered tasks.

PBIs are located on the left part of the board, tasks on the right columns. There is a column per possible task status (these statuses are configurable under Administration » Plugins » Scrum Redmine plugin).

A lot of the described features are enabled only with permissions, so take a look to Administration » Roles & permissions » Permissions report to enable/disable permissions for each role.

Working with PBIs

PBIs can be created in this board with the links at the end of the board or moved from the product backlog view.

Once you have PBIs on the Sprint board, you can dragged in vertical to change their order (so the team will start with the ones at the beginning). In the PBI post-it you will see its attributes (to enable more/less attributes take a look to Administration » Plugins » Scrum Redmine plugin). You can edit them clicking on the pencil icon.

PBIs are estimated in story points (SPs), you can edit directly this value clicking on the SPs value and typing a new value (then press ENTER or TAB). If use remaining story points is enabled (under Administration » Plugins » Scrum Redmine plugin) then you will see that field also in the post-it, it's also editable; this is used to calculate a precise Sprint burndown by SPs, so don't forget to update it day by day (before leaving the office).

Working with tasks

Tasks are technical things to be done in order to complete a PBI. They can be created directly clicking on the icon in the PBI post-its (or creating new child issues from the PBI issue form).

To change task status, just drag & drop in horizontal direction (or edit & change its status). Take care of your tracker work flow, because maybe some movements are forbidden for some roles (ask your administrators). There are a few automatic actions involved when you move task post-its (take a look to Administration » Plugins » Scrum Redmine plugin to enable/configure them):

  • When you move the first task from new (first tracker state defined in the admin settings) to any other state, the plugin change parent PBI status to in progress (the second state).
  • When you change a task status to anything but new, and it has not assignee, the plugin set it to current user; if the task is changed to new status, the assignee is removed.
  • When the last task is closed, the remaining effort is set to zero and the parent PBI is changed to a configurable status (i.e. resolved).

Tasks are estimated in hours, using the estimated effort field, this is also editable in the post-it. In order to calculate an Sprint burndown by hours is also necessary to fill the remaining effort field (day by day). You can log time to the tasks clicking on log entry icon.

As soon as you assign a task or log time into it, an orange mini-post-it (color is configurable under Administration » Plugins » Scrum Redmine plugin) is attached to the task, and a green one in case you log review time (review time has also to be configured under Administration » Plugins » Scrum Redmine plugin). This allow to follow up how is doing what easily.


Support this Redmine Scrum plugin

In order to be an open source & free plugin, I need your support:

or

Kindly regards,
Emilio González Montaña

Sprint board

2024-06-17

2024-09-15

4/4
10.0/10.0
100.0%

Product backlog items 新規 対応中 完了 クローズ 却下
#105: 床仕上げ
対象フェーズ: シャワー室&洗面所
Blocked: いいえ
StoryPoint: 3
sp
#135: フローリング8帖
masaya_abe
masaya_abe
7h h
#161: 一部隙間の断熱対応
masaya_abe
masaya_abe
1h h
#276: 物置部屋()との取り合い
masaya_abe
masaya_abe
2h h
#187: 排水口の仕上げ
masaya_abe
masaya_abe
1h h
#133: B室壁作成
対象フェーズ: B室/洗濯機
Blocked: いいえ
StoryPoint: 2
sp
#152: 右側壁の仕舞かたを決める
masaya_abe
masaya_abe
1h h
#153: 壁作成
masaya_abe
masaya_abe
7h h
#154: パイプ等固定,蛇口取付
masaya_abe
masaya_abe
2h h
#159: 天井レベル差対応
masaya_abe
masaya_abe
1h h
#172: 排水分岐の調達&施工(ボイラー逃し弁排水)
masaya_abe
masaya_abe
1h h
#186: ボイラー周りの逆止弁リプレイス
masaya_abe
masaya_abe
1h h
#188: 壁コーナーのパテ
masaya_abe
masaya_abe
2h h
#274: 漆喰仕上げ
masaya_abe
masaya_abe
4h h
#275: 漆喰下地目止めシーラー
masaya_abe
masaya_abe
3h h
#277: 面木,パテ,ファイバーテープ
masaya_abe
masaya_abe
3h h
#281: 洗濯機台&本体設置
masaya_abe
masaya_abe
5h h
#212: シャワー機材取付け
対象フェーズ: シャワー室&洗面所
Blocked: いいえ
StoryPoint: 2
sp
#213: シャワーカラン取付け
masaya_abe
masaya_abe
2h h
#214: 排水溝取付け
masaya_abe
masaya_abe
1h h
#44: シャワー室表面仕上げ
対象フェーズ: シャワー室&洗面所
Blocked: いいえ
StoryPoint: 3
sp
#86: 床 モルタル下地
masaya_abe
masaya_abe
5h h
#206: 調達(モルタル,ポリマー,骨材,タイル接着材)
masaya_abe
masaya_abe
2h h
#208: プライマー
masaya_abe
masaya_abe
2h h
#215: ウレタン塗料 壁
masaya_abe
masaya_abe
2h h
#216: FRP 壁上部追加施工
masaya_abe
masaya_abe
4h h
#219: 床モルタル勾配付け
masaya_abe
masaya_abe
3h h
#223: 床にウレタン塗料(5号珪砂入り)
masaya_abe
masaya_abe
4h h
#241: 入口仕上げ
masaya_abe
masaya_abe
2h h
#87: メタルメッシュ貼る
masaya_abe
h
#207: トンボ
masaya_abe
h
#217: 床タイル貼り
masaya_abe
h
#220: 床立ち上がりタイル貼り
masaya_abe
h
#221: 床立ち上がりビニタイル貼り
masaya_abe
h